Proposed Projects

The District is proposing the following projects in the May 8, 2010 Bond Election:
1. Additions and Renovations to East Elementary School
2. New Elementary School
3. Additions and Renovations to South Elementary School to create a new Junior High Campus
4. Additions and Renovations to Breckenridge High School and the existing Junior High School

Additions and Renovations to East Elementary School
Grades Pre-K - Kindergarten

  • Renovate the 1959 building to meet TEA standards, building code and handicap accessibility requirements
  • Renovate corridors, classrooms, restrooms, administration and cafeteria
  • Secure the front entrance to the school
  • Construct a new activity center and exterior hard court play surface
  • Add a new bus drive
  • Add new staff and visitor parking
  • Add security fence around campus perimeter
  • Construct a new canopy at parent drop-off/pick-up for children loading/unloading
  • Patch, repair and paint building exterior
  • Add new fire sprinkler system
  • Replace roof
  • Replace exterior windows

    For more information you can download the image here, or view in a window by clicking on the image below.
    Site Plan 
    Estimated Cost: $3,066,644

    New Elementary School
    Grades 1 - 5

  • Will replace North Elementary School
  • Located on Highway 183, immediately north of North Elementary School on 30 acres
  • Core capacity for 650 students
  • Separate parent and bus traffic
  • Full masonry exterior
  • High performance finishes
  • Energy-efficient lighting and windows

    For more information you can download the image here, or view in a window by clicking on the image below.

    Site Plan  Site Plan

    Estimated Cost: $13,321,051

    Additions and Renovations to South Elementary School to create a new Junior High Campus
    Grades 6 - 8

  • Renovate the 1959 building to meet TEA standards, building code and handicap accessibility requirements
  • Renovate corridors, classrooms, computer labs, administration, current fine arts area and restrooms
  • Secure the front entrance to the school
  • Construct a new addition with a new cafeteria/kitchen, library, band hall, choir room, classrooms, computer labs, gymnasium and locker rooms
  • Relocate and renovate Life Skills classroom
  • Patch, repair and paint building exterior
  • Add new fire sprinkler system
  • Upgrade roof
  • Replace exterior windows
  • New front walkway canopy
  • Add/replace acoustical panels, replace sound system and repair/replace ceilings and paint in gymnasium
  • Replace kitchen equipment
  • Add new band equipment
  • Add new parking and repair existing asphalt drives
  • Address site drainage
  • Add security fence around campus perimeter

    For more information you can download the image here, or view in a window by clicking on the image below.
    Site Plan   Site Plan
    Site Plan 
    Estimated Cost: $10,996,539

    Additions and Renovations to Breckenridge High School and the existing Junior High School
    Grades 9 - 12

  • Renovate the original high school and junior high school buildings to meet TEA standards, building code and handicap accessibility requirements
  • Renovate corridors, restrooms, classrooms, computer labs, administration, science labs, Art, Career Tech classrooms and Life Skills
  • Renovate façade and secure the front entrance to the school
  • Construct a new addition with a library, computer labs, band hall, choir hall, cafeteria/kitchen and student commons
  • Construct a new Career & Technology addition with vocational shops and classrooms
  • Add/replace acoustical panels, replace sound system and repair/replace ceilings and paint in gymnasium and renovate locker rooms
  • Replace kitchen equipment
  • Add new band equipment
  • Construct new concessions and restroom facility at south end of stadium (existing will be demolished to add more parking)
  • Patch, repair and paint building exterior
  • Add new fire sprinkler system
  • Upgrade roof
  • Replace windows
  • Construct new on-site parking for staff, students and visitors
  • Add security fence around campus perimeter
  • Add new covered walkways
  • Address site drainage

    For more information you can download the images here, or view in a window by clicking on the image below.
    3D Rendering  3D Rendering 
    Site Plan  Site Plan 
    Estimated Cost: $15,296,558